|
RadnorImages Protected by a Creative Commons Licence. |
|
Hereford, Hay and Brecon Railway
View location
This part of the railway followed the course of the 1816 Hay Railway, a tram-road worked by horses connecting the town of Hay with the Brecknock and Abergavenny Canal at Brecon. This tunnel required widening and deepening for use by standard gauge trains.
The 674-yard long tunnel opened on May 7, 1816 as part of the Brecon to Hay tramway. |
Photographer:
John Crellin |
Back to: Photos; Hereford, Hay and Brecon Railway; Gallery
Enquiry / feedback |
22 November 2018 |
|
|
NIKON D750 22/11/2018 11:50:34 1/20 sec - F/8 Focal Length: 24mm Exposure mode: Shutter speed priority AE Metering: Multi-segment Focussing: Sensitivity: ISO 400
|