Talyllyn Tunnel West Portal, 1 of 5

Home Pictures Desktop background Recent Gallery About RadnorImages Contact
 
Talyllyn Tunnel West Portal
 
Hereford, Hay and Brecon Railway


View location

This part of the railway followed the course of the 1816 Hay Railway, a tram-road worked by horses connecting the town of Hay with the Brecknock and Abergavenny Canal at Brecon. This tunnel required widening and deepening for use by standard gauge trains.

The 674-yard long tunnel opened on May 7, 1816 as part of the Brecon to Hay tramway.
Photographer: John Crellin

Back to: Photos; Hereford, Hay and Brecon Railway; Gallery

Enquiry / feedback

22 November 2018  
 
NIKON D750
22/11/2018 11:50:34
1/20 sec - F/8
Focal Length: 24mm
Exposure mode: Shutter speed priority AE
Metering: Multi-segment
Focussing:
Sensitivity: ISO 400
Image count =  
      Next

My portfolio at Alamy